About GCE Mine:
GCE Blaisdell Mine was established in 2024. GCE mines aggregate and associated materials to produce a variety of products including sand, gravel, fill and asphalt. Our 2025 Peterbilt 567 Trucks have the capacity to haul an average of 24 tons, and our 2025 Armor Lite trailers can carry up to 23 tons.
Sand & Gravel
Our Goodfellow Dry Plant/Wash Plant consists of a 400 HP cone crusher, a triple deck screen and conveyor belts. Product sizes can be varied by changing screen sizes. GCE typically produces 3/8", 1/2" rock, 3/4" rock, ABC, M.A. fines and oversize riprap materials.
Contact us for more information, availability and pricing.
Location:
The GCE Blaisdell Mine is located East of Highway 95, between County 7th and 8th Street.
Address:
GCE Blaisdell Mine
7355 S. Kelland Dr.
Yuma, AZ 85367
(928) 517-7013
Site Contact and Material Estimates:
Clinton Kelland, Mine Operations Manager
(928) 304-0340
ckelland@gce-pc.com
Project Estimates:
Jordan Canales, Lead Estimator
(928) 446-1177
jcanales@gce-pc.com
Mine/Materials
Asphalt
Our portable 2024 CMI 300 TPH Counter Flow Hot Plant consist of an aggregate weigh feed conveyor, Magnum 300 counterflow drum-mix and burner, RA418 RotoAire – baghouse, 95-ton SE195 self-erect mixed material storage system, PRB-120 RAP feed system & Rolls breaker, and a split-level control house. Contact us for Mix Design and availability.
Email:
mineorders@gce-pc.com
Mine Office:
(928) 517-7013
Operating hours vary by season.
• Summer Hours: 5:00 am to 3:00 pm
• Winter Hours: 7:00 am to 5:00 pm
Clinton Kelland
Mine Operations Manager
Mobile:
(928) 304-0341
Email:
ckelland@gce-pc.com
Charlie R. Vesci
Trucking Superintendent
Mobile:
(520) 266-3015
Email:
cvesci@gce-pc.com











